Service and experience you can trust

BOILER CIRCULATION SYSTEM

Project Details

PROJECT

REPLACEMENT OF ENTIRE BOILER CIRCULATION SYSTEM

DESCRIPTION

Design system and provide upgrade a problematic boiler circulation system.

INDUSTRY SECTOR

Industry.

INFRASTRUCTURE

Duty/Standby pumping arrangement.
Dedicated controls and instrumentation.
Auto refill header tank c/w elevated stand and drop tray.
Custom fabricated piping and fittings including adaptive mounting infrastructure.
Heat shielding and Insulation lagging.

DETAILS

An existing boiler circulation system, with inherent operational and maintenance issues was
successfully replaced with an upgraded system.
This upgrade affording; increased efficiency, lower operational costs, increased reliability,
reduction/elimination of downtime and easier maintenance.
Fabrication, installation and commissioning involved with this project was scheduled and
conducted so as to minimise any undue impact upon production.

Find Out More

Contact J.A.C. Pump Services for water management supply, repair and installation that you can trust.