Project Details
PROJECT
ARTICULATED RAW WATER INTAKE PIPELINE REFURBISHMENT
DESCRIPTION
Upgrade & Rehabilitation of inoperative flexible intake pipework.
INDUSTRY SECTOR
MUNICIPAL
INFRASTRUCTURE
Articulated DN450mm trunnion pipeline designed to modulate with varying river level.
OVERVIEW
J.A.C. Pumps installed temporary water intake pipework to secure town water supply. Comprehensive ‘root cause analysis’ of all componentry was conducted. Repairs/upgrades to entire system were undertaken and smoothly reinstalled and commissioned at remote location.